Underwater bow thruster operation in Oslo

Underwater bow thruster operation in Oslo

Recently a team of our diver/technicians mobilized to Oslo, Norway for an underwater bow thruster operation on a large ferry. A seal in the gearbox was leaking and needed to be replaced. A small window was made available for the operation, but the repair had to be finished before the next scheduled trip.

A preliminary inspection of the bow thruster had revealed the cause of the leak. After studying the information, we proposed to replace the defective seal underwater with a tailor-made cofferdam. This cofferdam was designed by our R&D department and fabricated at our headquarters in Antwerp.

One of our teams then traveled to Oslo with a Hydrex truck and all the required equipment. After arriving on site, they set up a monitoring station next to the ferry. The cofferdam was then brought into the thruster tunnel, positioned over the gearbox and secured. This allowed the divers to remove the water from the cofferdam. As a result a dry working environment was created around the gearbox for our men to work in.

The team then safely removed the thruster case cap. This gave them access to the damaged seal ring, which they replaced with a new one to conclude the repair part of the operation.

All that needed to be done was to fully reassemble the gearbox and remove the cofferdam.

Conclusion
Flexibility is an important element of every job we carry out, but in this case it was crucial that the repair was finished before the ferry needed to depart with its passengers.

Taking into account the scope of the job this was not an easy feat. The team worked in shifts throughout the entire operation. We adapted the operation to the schedule of the ship without losing the safety and quality standards that we impose on any job we perform.

If you need information on bow thruster repairs or any other underwater operation, feel free to contact us. Our technical department is ready to assist you 24/7.

Share this post