Going to drydock had not been an option in 2006 for an offshore crane barge that was servicing rigs on an oilfield off the coast of Gabon. When one of its four 40-ton thrusters malfunctioned we therefore designed a large mobdock (weighing over 25 tons by itself) to remove the thruster on-site.
Click on the image below to read the full article.